Laban Contemporary Dance Studio
London SE8
Industry Sector
Leisure/Culture
Timescale
Complete
Scope of works included -
-
Install Cat 6 RJ45 outlets throughout the whole complex
-
Implement a voice connection at MER presenting 240 lines at the cabinet
-
Install voice connection cabling at mini hub presenting 96 lines into the cabinet
-
Configure and install 2no. 8core fibre optic cables between hub and MER
-
Configure and install 48no. Cat 6 LSOH link cables between the MER and the Sound / AV cabinets
-
Procure and install of 4no. 42u free standing cable cabinets around the complex
-
Supply 230 x 80 2mtr Cat 6 patch leads, together with numerous fibre optic patch lead
|